Nortel Meridian 1 Manual page 363

System installation procedures
Table of Contents

Advertisement

Figure 118
Top cap assembly
Front of column
4
Re-level the column, adding or removing shims as needed. Go back and
re-level any other columns.
5
Repeat the above steps until all columns have been positioned.
6
Slide shims completely under seismic plates. First tighten the pedestal
mounting bolts, torque to 122 Newton-meters (90 ft-lbs). Then, tighten
the concrete anchors, torque to 48 Newton-meters (35 ft-lbs).
Installing earthquake bracing
Mounting bolts
Top cap
LED
System installation procedures
Page 325 of 500
553-3038
Screw for LED bracket
on perforated panel
553-3038