Nortel Meridian 1 Manual page 527

System installation procedures
Table of Contents

Advertisement

CE/PE (common equipment/peripheral equipment)
backplane cabling, 439, 441, 466
backplane slots, 74
BIX labels, 72
BIX layout, 71
cable connections, 203, 208
line pair-termination tables, 214, 445
line pair-terminations tables, 446
system monitor connections, 102
trunk pair-termination tables, 213, 215, 445,
448
circuit breakers
DC power, 52, 54
in power-up, 300, 301
module additions, 364, 367, 369, 374, 383
PDU, 412
power distribution box installation, 399
circuit cards, 6
CMA (changeover and memory arbitrator) cards
sysloads, 309
CMDU (core multi-drive unit), 313
CO/FX/WATS trunk pair-terminations, 252
column positioning with spacers, 31
columns, 3
adding modules to, 363
fourth modules on, 23, 24
module additions, 374
configuring
remote peripheral equipment, 333
system monitors, 91
Configuring the Motorola 28.8 Data/Fax Modem,
122
connecting power
UK, 435
connections
CNI to 3PE (NTND14 cables), 170
connectors, 203
control and distribution panels, 47
converter cards, 333, 339, 351, 352
core modules
jumpers, 19, 20
core/network modules
jumpers, 19, 20, 21
covers, module, 15, 16
CP (call processing) cards
sysload acceptance tests, 310
sysloads, 309
system terminal connections, 106, 113
CPIO ports
modem connections, 120, 127, 130, 131
system terminal connections, 113, 114, 116,
118
cross connections, RPE, 347, 348, 349
cross-connecting wire, 212, 445
current and voltage meters, 478
D
D connectors
line pair-terminations, 246, 248
RPE connections, 336, 344
data disks, 7
DC (direct current) power systems, 45
connecting power, 301
external, 46
installing, 56, 404
PDU connections, 52
preparation, 58
references, 2
safety ground/protective earth and logic return
wiring, 49, 56
DCE (data communication equipment), 113
DCON connections, 388, 389
designation labels, BIX, 68, 70
disk drive units
acceptance tests, 312
disks, 7
dispatch modems, 121
distribution boxes
installing, 386, 390, 397
rectifier adjustments, 395
rectifier connections, 400
rectifier mounting, 392
second, adding, 399
DLB (dual loop peripheral buffer) cards
network card cabling, 187, 191
RPE connections, 336, 339
System installation procedures
Index
Page 489 of 500

Advertisement

Table of Contents
loading

Table of Contents