Nortel Meridian 1 Manual page 378

System installation procedures
Table of Contents

Advertisement

Page 340 of 500
Figure 129
RPE cabling to a collocated Meridian 1 column and PE modules
RPE Backplane
(local site)
E
F
NT8D86
Cables
Net
UEM
Core/Net
UEM
Meridian 1 column
553-3001-210 Standard 14.00 June 1999
Configuring remote peripheral equipment
Standard 25-pair T/R Cables
C
MDF
D
NT8D73 Cables
I/O to Network Card
NT8D86 Cables
(odd and even loops)
Telephones and consoles are cross-connected to PE modules as described in
Telephone and attendant console installation (553-3001-215).
The local and remote RPE Modules are cross-connected to the digital carrier
cable pairs, as shown in Figures 130 and 131.
The RPE maintenance leads are cross-connected, as shown in Figure 132.
I/O Panel
ORB
MDF
NT8D85 Cables
RPE Backplane
(remote site)
C
D
LPY
LPY
LPX
LPX
PE Modules—front
(remote site)
553-7561
553-7561
E
F

Advertisement

Table of Contents
loading

Table of Contents