Nortel Meridian 1 Manual page 386

System installation procedures
Table of Contents

Advertisement

Page 348 of 500
Figure 132
Maintenance lead cross-connections (Part 2 of 2)
System equipped with ORB at local, remote, or both locations
Local RPE module
Cable
Wire
no.
color
S-W
W-S
BL-R
C
R-BL
O-R
R-O
G-R
R-G
G-R
R-G
D
BR-R
R-BR
O-R
C
R-O
D
R-G
Note 1: Cross-connections are shown when ORB is located at the local end.
Note 2:
above for the local end are connected at the remote end, and the
connections shown for the remote end are connected at the local end.
Note 3: If there is an ORB at the local and remote ends, cross-connections
for both ends are the same as shown above for the local end.
Note 4:
553-3001-210 Standard 14.00 June 1999
Configuring remote peripheral equipment
Lead
name
OWT
O
OWR
R
FLT
B
FLR
FLWA
FLWB
WFIT
WFIR
DSCT
DSCR
DETT
DETR
FLWA
Additional RPE
FLWB
DCSR
If ORB is located at the remote end, the cross-connections shown
All modules are assumed to go to the same remote location.
modules
Remote RPE module
Lead
Wire
Cable
name
color
no.
OWT
S-W
OWR
W-S
FLT
BL-R
FLR
R-BL
C
FLWA
O-R
FLWB
R-O
WFIT
G-R
WFIR
R-G
DSCT
G-R
DSCR
R-G
D
DETT
BR-R
DETR
»
FLWA
O-R
C
FLWB
R-O
DCSR
R-G
D
553–5324
553-5324p2

Advertisement

Table of Contents
loading

Table of Contents