Nortel Meridian 1 Manual page 98

System installation procedures
Table of Contents

Advertisement

Page 60 of 500
Installing DC power
553-3001-210 Standard 14.00 June 1999
14 Connect wires to the PDU:
Connect a red wire to -BAT 0/1 for modules 0 and 1, and another red
wire to -BAT 2/3 for modules 2 and 3 on the connection block.
Connect a black wire to +RTN 0/1 for modules 0 and 1, and another
black wire to +RTN 2/3 for modules 2 and 3 on the connection
block.
Connect the (orange or white) wire to the LRTN terminal on the
connection block.
15 Connect wires to the power plant:
Connect the red wires to the first two circuit breakers in the main
control/distribution panel. See Figure 32 for PDU to MFA150
connections and Figure 33 for PDU to System 600/48 connections.
Each new column connects the next two available circuit breakers.
Note: If only two modules are used in the column, make sure the CB2
and CB3 circuit breakers are set to off.
Connect the black wires to the ground bus/LRE.
Connect the orange or white wire to ground bus/LRE.
16 Replace the metal safety cover over the terminal block on the PDU.
Lower the front panel over the mounting screws on the PDU.
Tighten the screws holding the cover.
17 Replace the power plant cover.
18 Replace the junction box cover.