Moving the PROCESSOR to Its Final Position
Figure 24
[67] Move the PROCESSOR and MOUNTING STAND flush against the WOOD FRAME.
[68] If you will be using the SEISMIC BRACKET KIT and did not install the special FLOOR PLATES from the
SEISMIC BRACKET KIT, position the FLOOR PLATES provided under the LEVELING FEET of the
MOUNTING STAND.
[69] Fasten the EYEBOLTS inside the darkroom using:
• 2 WASHERS
• 2 NUTS
[70] For installations where the REPLENISHMENT TANKS are located in the darkroom, use opaque CAULK to
make a lighttight seal around all the holes cut in the WOOD FRAME.
[71] Check that:
• all GASKETS are compressed
• no obvious light leaks exist
[72] Check that the PROCESSOR is level front-to-back and side-to-side. See the section "Leveling the
PROCESSOR" on Page 47.
[73] Install the 2 SIDE ACCESS PANELS and the BACK ACCESS PANEL on the PROCESSOR.
[74] Check that the TOP COVER of the PROCESSOR can be easily installed and removed.
[75] If the LIGHTTIGHT FEED TRAY is installed, check that it can be easily opened.
[76] Turn off the lights in the darkroom. Check for light leaks. If necessary, make corrections.
[77] If you plan to secure the MOUNTING STAND to the floor, install the SEISMIC BRACKET KIT 261413 by
following the instructions provided with the KIT.
981088 – September 1995
Installing the PROCESSOR
FEED TRAY
WOOD FRAME
GASKET
WASHER (2)
NUT (2)
EYEBOLT (2)
H130_0128BCA
H130_0128BA