DOK-CONTRL-S20*SSDO*8*-AP02-EN-P
IndraControl S20 Module With Safe Digital Outputs S20-SSDO-8/3
Checklist to plan and use the module
No.
Request (optional)
16
Were the specifications and electric installation
specified (e.g. EPLAN) and provided to the exe‐
cuting bodies?
17
Were the specifications for the commissioning
specified and provided to the executing bodies?
Bosch Rexroth AG
71/85
Checklists
Yes
No
Notes
□
□
□
□
Date
Signature
(editor)
Date
Signature
(tester)