Installing The Tpm - Huawei FusionServer Pro XH321 V5 Maintenance And Service Manual

Server node
Hide thumbs Also See for FusionServer Pro XH321 V5:
Table of Contents

Advertisement

FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
Figure 8-47 Removing a TPM
Step 8 Remove M.2 SSDs.
For details, see
Step 9 Place the removed component in an ESD bag.
Place only one component in an ESD bag.
----End

8.4.16 Installing the TPM

Procedure
Step 1 Power off the server node.
For details, see
Step 2 Remove the server node.
For details, see
Step 3 Place the server node on the ESD workstation.
Step 4 Remove the air duct.
For details, see
Step 5 Determine the position of the TPM.
Issue 17 (2021-03-09)
8.4.1 Removing an M.2
NO TICE
8.3.2 Power-Off
8.3.3 Removing an XH321
8.4.23 Removing the Air
Copyright © Huawei Technologies Co., Ltd.
SSD.
Procedure.
V5.
Duct.
8 Parts Replacement
81

Advertisement

Table of Contents
loading

Table of Contents