Huawei FusionServer Pro XH321 V5 Maintenance And Service Manual page 80

Server node
Hide thumbs Also See for FusionServer Pro XH321 V5:
Table of Contents

Advertisement

FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
3.
4.
5.
Step 8 Apply thermal compound.
1.
Issue 17 (2021-03-09)
Figure 8-35 Installing one end of the processor
Bend the other edge of the processor carrier in the arrow direction.
Figure 8-36 Installing the other end of the processor
Release the processor carrier so that the other edge of the processor clips into
place.
Check that the processor and the carrier are level and the processor is firmly
secured. If the processor is tilted, gently press the tilted part to fasten it.
Determine the area on the processor that will be in contact with the heat
sink, and evenly apply 0.4 ml of thermal compound on the area.
NO TE
– When applying thermal compound, place the processor carrier on the desktop.
– The thermal compound injector has volume marks.
The two-line, five-dot, s-shape, and X-shape patterns are recommended.
Copyright © Huawei Technologies Co., Ltd.
8 Parts Replacement
71

Advertisement

Table of Contents
loading

Table of Contents