Huawei FusionServer Pro XH321 V5 Maintenance And Service Manual page 82

Server node
Hide thumbs Also See for FusionServer Pro XH321 V5:
Table of Contents

Advertisement

FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
2.
Step 10 Install the processor and conjoined heat sink.
1.
2.
Issue 17 (2021-03-09)
Figure 8-39 Installing the processor carrier
Place the assembled processor and heat sink upside down on the desk, and
check that the processor carrier and the heat sink are firmly secured. If the
processor carrier is not firmly buckled with the heat sink, gently press the
processor carrier to secure it.
Remove the processor socket cover.
NO TICE
When removing the protective cover, pull it out vertically to prevent damage
to the pins on the processor socket.
Shine a light at various angles onto the processor socket to check for twisted
pins, foreign matter, and pad damage.
NO TICE
If bent pins or foreign matters are found or the bonding pad is damaged, stop
the operation and contact technical support.
Copyright © Huawei Technologies Co., Ltd.
8 Parts Replacement
73

Advertisement

Table of Contents
loading

Table of Contents