Huawei FusionServer Pro XH321 V5 Maintenance And Service Manual page 79

Server node
Hide thumbs Also See for FusionServer Pro XH321 V5:
Table of Contents

Advertisement

FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
Step 2 Remove the server node.
For details, see
Step 3 Place the server node on the ESD workstation.
Step 4 Remove the air duct.
For details, see
Step 5 Take the component out of its ESD bag.
Step 6 Determine the position of the processor.
Figure 8-34 Positions of processors
Step 7 Install the processor on the carrier.
1.
2.
Issue 17 (2021-03-09)
8.3.3 Removing an XH321
8.4.23 Removing the Air
Take a processor carrier out of an ESD bag.
Aligning the notch in one edge of the processor with the protrusion on the
processor carrier, secure it.
Ensure that the processor corner with a triangle mark is in the corner of the
processor carrier with a notched triangle.
Copyright © Huawei Technologies Co., Ltd.
V5.
Duct.
8 Parts Replacement
70

Advertisement

Table of Contents
loading

Table of Contents