Table 22: Site Preparation Checklist (continued)
Item or Task
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor and
building structure.
Cables
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
RELATED DOCUMENTATION
Installing and Connecting an ACX2000 or ACX2100 Router Overview | 93
ACX2000 and ACX2100 Site Guidelines and
Requirements
IN THIS SECTION
General Site Guidelines | 70
Site Electrical Wiring Guidelines | 70
Clearance Requirements for Airflow and Hardware Maintenance on ACX2000 and ACX2100 Routers | 71
Chassis Physical Specifications for ACX2000 and ACX2100 Routers | 72
For More Information
"Clearance Requirements for Airflow and Hardware
Maintenance on ACX2000 and ACX2100 Routers" on
page 71
69
Performed By
Date