Avaya Aura System Platform Installing And Configuring page 35

Table of Contents

Advertisement

2. Carefully lift the server and tilt it into position over the slide rails so that the rear nail
3. Slide the server down until the rear nail heads slip into the two rear slots.
4. Slowly lower the front of the server (4) until the other nail heads slip into the other
5. Make sure that the front latch (5) slides over the nail heads. See the preceding
6. Lift the locking levers (6) on the slide rails. See the following figure.
7. Push the server (7) all the way into the rack until it clicks into place. See the
8. Insert the optional M6 screws (8) in the front of the server when you move the rack
Installing and Configuring Avaya Aura
heads (2) on the server line up with the rear slots (3) on the slide rails. See the
preceding figure.
slots on the slide rails. See the preceding figure.
figure.
preceding figure.
cabinet or if you install the rack cabinet in a vibration-prone area. See the following
figure.
System Platform
Installing and connecting the S8800 Server
April 2010
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents