Preparing For The Upgrade - Nortel 1000E Upgrade

Option 11c chassis upgrade
Table of Contents

Advertisement

Page 44 of 228
Review Prerequisites Checklist

Preparing for the upgrade

NN43041-465
Standard 01.04
Review all product bulletins and Nortel Alerts that impact the site.
Prepare a contingency plan for backing out of the upgrade.
DANGER OF ELECTRIC SHOCK
In a DC-powered system, power to the column can
remain on during the following procedures. In an AC-
powered system, however, power to the entire column
must be shut down throughout the procedures.
Preparing for an upgrade involves the following tasks:
Identify and become familiar with all procedures.
Verify that all installed applications meet the minimum software
requirements for the target platform.
Determine and note current patch or Dep lists installed at the source
platform.
Determine required patch or Dep lists at the target platform for all
system-patchable components (Call Servers, Voice Gateway Media
Cards, Media Gateway Controllers, Signaling Servers and so on).
Determine the required patches or DEP lists installed on all applications.
Determine and communicate the required maintenance window,
contingency plan and the impact to the customer to complete the
procedure.
Perform an inventory on required software and hardware.
July 2007

Advertisement

Table of Contents
loading

Table of Contents