Nortel 1000E Upgrade page 141

Option 11c chassis upgrade
Table of Contents

Advertisement

Figure 65
Installed rack-mount bracket
2
Communication Server 1000E Upgrade
When both brackets are fixed in place:
a.
Align the rack-mount brackets on the ISP1100 Signaling Server with
the slide rail system on the rack posts.
b.
Slide the ISP1100 Signaling Server in place. Refer to Figure 66 on
page
142.
Option 11C Chassis to Communication Server 1000E
Installing a Signaling Server
Page 141 of 228

Advertisement

Table of Contents
loading

Table of Contents