Toro Reelmaster 5100-D Service Manual page 276

Hide thumbs Also See for Reelmaster 5100-D:
Table of Contents

Advertisement

31. Put two alignment pins into the metering ring
(Fig. 94).
32. Stack the isolation manifold (4 plates bonded to­
gether) onto the metering ring, aligning the grooves on
the side of the manifold with the grooves on the side of
the upper cover plate (Fig. 95). Align the alignment pin
holes with the alignment pins in the metering ring. The
isolation manifold surface without the recessed slots
must be toward the metering ring.
33. Install two alignment pins into the isolation manifold
(Fig. 96).
Repairs
Page 7 - 46
Figure 94
Figure 95
Figure 96
®
Reelmaster
223-D/5100-D/5300-D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents