Governor Inspection - Toro Reelmaster 5100-D Service Manual

Hide thumbs Also See for Reelmaster 5100-D:
Table of Contents

Advertisement

Governor Inspection

A governor failure can cause engine starting failure, loss
of engine speed control, or engine surging (hunting).
Before removal and disassembly of the engine the
following inspections are recommended:
1. Stop the engine, lower the implement and engage the
parking brake. Open the engine hood.
2. Remove the governor tie rod cover (Fig. 28).
3. While holding the stop lever (Fig. 33) in the stop
position (towards the rear of the machine) turn the
ignition key switch quickly to the START position and
release it to the ON positon. This will retract the stop
solenoid plunger, allowing movement of the injection
pump control rack.
Governor System Repairs
4. Push the tie rod forward only with only enough force
to overcome the spring pressure and operate the speed
control lever (or throttle lever). You should feel the
governor lever, under spring tension, move the tie rod
and control rack as the lever is operated.
5. If the control rack does not move move correctly,
disconnect the tie rod from the injection pump control
rack. Make sure the injection pump control rack moves
freely. If it does not, check for injection pump problems.
6. Failure of the speed control lever or governor lever to
move when the tie rod is disconnected may indicated a
problem with internal parts of the governor.
Figure 34
Page 3 - 32
®
Reelmaster
223-D/5100-D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents