Loading Bucket - Yanmar SV26 User Operation And Maintenance Manual

Mini excavator
Table of Contents

Advertisement

Note
8. Grease the hinged parts.
Special features concerning the hammers
1. Connect the coupled hoses from the hammer to the machine connections.
14 Implementing the 3rd hydraulic circuit, page 112
2. In the absence of quick couplers, remove the plugs from the hoses on the machine and drain
the oil accumulated in the hoses.
Always drain the machine's oil into a safe container and never directly onto the ground.
3. Connect ports A and P, then ports B and T with hydraulic hoses.

12.2.1 Loading bucket

Take care not to damage seals on each bushing side.
1. Clean and lubricate the bores.
2. Put the o-rings in place.
3. Align the pin bore with the bucket A bore.
Add shims to compensate for play if necessary.
4. Insert the swivel pin into bore A.
IMPORTANT
Protect the various elements from dirt and dust.
12 Accessory change by direct coupling
Make sure to install the swivel pin stops
correctly by positioning them with the flat
plane against the stop.
1 = Arm
2 = Bucket link
109

Advertisement

Table of Contents
loading

Table of Contents