Definity Ecs Si In An Scc - Avaya S8500 Manual

Migrating to the media server
Hide thumbs Also See for S8500:
Table of Contents

Advertisement

Migrating hardware
This is a service-affecting event. The PPN must be powered down to replace the carrier. Before powering
down the cabinet, you must do some premigration administration (see
SI, CSI)
on page 78 for the specific steps.
S8700 IP:
Migrating an existing DEFINITY ECS R or SI to the S8700 or S8710 IP Connect configuration requires
moving allowable circuit packs to an Avaya G650 Media Gateway. The MCC cannot be reused. For
specific information on how to do this, see
This is a service-affecting event. The port networks must be powered down to move the circuit packs.

DEFINITY ECS SI in an SCC

The migration process differs, depending on whether the migration is to an S8700 or S8710 Multi-
Connect or IP Connect configuration.
S8700 MC
If all the port networks are connected through a Center Stage Switch (CSS) or Asynchronous Transfer
Mode (ATM), we recommend replacing the tone clocks with IPSI circuit packs in the processor port
network (PPN) and expansion port networks (EPNs) first. The IPSIs are hot swappable. For specific
information on how to do this, see
If all the port networks are direct connect, we recommend that you install one IPSI in the existing PPN
rather than in one of the EPNs. But before installing the IPSI, you must convert the PPN to an EPN by
replacing the processor control cabinet with an expansion control cabinet and removing all the control
circuit packs. For specific information on how to do this, see
port network (SCC)
This is a service-affecting event. The PPN stack must be powered down to replace the cabinet. Before
powering down the cabinets, you must do some premigration administration (see
administration (R, SI, CSI)
S8700 IP
Migrating an existing DEFINITY ECS SI to the S8700 or S8710 IP Connect configuration requires
moving allowable circuit packs to an Avaya G650 Media Gateway. The SCC cannot be reused. For
specific information on how to do this, see
This is a service-affecting event. The port networks must be powered down to move the circuit packs.
54
Migrating from a DEFINITY ECS R or SI
Upgrading and administering the existing hardware
on page 86.
on page 78 for the specific steps.
Migrating from a DEFINITY ECS R or SI
Migrating to the Avaya S8700 or S8710 Media Server
Preconversion administration (R,
on page 90.
on page 56.
Converting a processor port network to a
Preconversion
on page 90.
June 2004

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8700S8710

Table of Contents