Make sure cable clamp is positioned as shown.
1. Cable clamp
Route the hydraulic unit and trim sender har-
nesses through the grommet in the port stern
bracket.
Secure harness in wire clamp as shown.
1. Wire clamp
STERN BRACKET – POWER TILT MODELS
Install bushings in hydraulic unit. Position hydrau-
lic unit between stern brackets and install the
angle adjustment rod.
1
007696
Place the ground lead between the port stern
bracket and tie bar as shown. Assemble the tie
bar to the stern brackets. Apply Ultra Lock to the
threads of the tie bar screws. Install the screws
and tighten to a torque of 144 to 168 in. lbs. (16 to
19 N·m).
007697
1
007698
MIDSECTION
1
007699
007700
11
007692
211