Toro Groundsmaster 4300-D Service Manual page 386

Hide thumbs Also See for Groundsmaster 4300-D:
Table of Contents

Advertisement

Removing the Cutting Deck Carrier Frame
Installing the Cutting Deck Carrier Frame
Cutting Deck: Service and Repairs
g186181
Each cutting deck is suspended from a carrier frame. The cutting deck carrier
frame is attached to the lift arm and allows the cutting deck to pivot on the lift arm
pivot shaft. The cutting deck positions are identified in
Remove the cutting deck from the lift arm pivot shaft as follows:
1. Park the machine on a level surface, lower the cutting decks, shut off the
engine, set the parking brake, and remove the key from the key switch.
2. Remove the lynch pin and thrust washer that secure the carrier frame to
the lift arm pivot shaft.
3. Slide the cutting deck assembly off the pivot shaft and away from the
machine.
4. Disassemble the carrier frame as necessary
1. Assemble the carrier frame as necessary
2. Slide the cutting deck assembly onto the pivot shaft on the lift arm.
3. Secure the cutting deck to the pivot shaft with the thrust washer and lynch pin.
4. Lubricate the carrier frame grease fittings.
Figure 244
(Figure
Page 7–24
Figure
244.
(Figure
243).
243).
Groundsmaster
16226SL Rev C
®
4300-D

Advertisement

Table of Contents
loading

Table of Contents