Tools Required; Removing Transport Rails; Screwing The Transport Units Together - Siemens SINAMICS GM150 Operating And Installation Instructions

Medium-voltage drive
Hide thumbs Also See for SINAMICS GM150:
Table of Contents

Advertisement

Installation

5.2 Tools required

5.2
Tools required
Installation of the connections requires the following tools:
● Wrench or socket wrench, width across the flats 10, 13, 16/17, 18/19
● Allen key, size 8
● Torque wrench up to 50 Nm
● Screwdriver, size 2
● Torx T20 and T30 screwdrivers
5.3

Removing transport rails

Support rails for crane transportation are attached to the bottom of the cabinet.
To remove the rails, remove the fixing screws
Figure 5-1
5.4

Screwing the transport units together

NOTICE
Stress
Stress that occurs during transport may exert mechanical pressure on the components.
Material damage can result.
● Line the cabinets up precisely with each other in order to avoid shearing forces when the
● Install the drive only on a level and horizontal surface.
88
Removing the support rails
base units are screwed together.
with an M12 spanner.
SINAMICS GM150 6SL3815-2LN41-4AA2
Operating Instructions 04/2017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents