Security Information - Siemens SINAMICS GM150 Operating And Installation Instructions

Medium-voltage drive
Hide thumbs Also See for SINAMICS GM150:
Table of Contents

Advertisement

Safety instructions
2.7 Information for nominated persons in control of an electrical installation
The nominated person in control of an electrical installation must ensure that the following
points are observed:
● Follow the local and industry-specific safety and setup regulations. Observe the
● The operating instructions and the complete product documentation are always available
● The technical data as well as the specifications relating to the permissible installation,
● Only qualified personnel or personnel supervised by responsible, skilled specialists are
● During shipping, specific transport conditions are adhered to.
● Assembly is performed according to assembly instructions. Separate cabinet units are
● All instructions for EMC-compatible installation, cabling, shielding, grounding, and for
● Commissioning is only to be performed by qualified personnel trained for that purpose in
● System configuration is carried out by an experienced system integrator. Further system
● The converter is only operated in conjunction with the engineered components.
● Different operating modes, overloads, load cycles, and differing environmental conditions
Note
Make use of the support and services offered by the relevant service center for planning,
installation, commissioning, and servicing work. You can find the relevant contact person under
"Service & Support".
2.7.2

Security information

Siemens provides products and solutions with industrial security functions that support the
secure operation of plants, systems, machines, and networks.
In order to protect plants, systems, machines and networks against cyber threats, it is
necessary to implement – and continuously maintain – a holistic, state-of-the-art industrial
security concept. Siemens' products and solutions only form one element of such a concept.
Customer is responsible to prevent unauthorized access to its plants, systems, machines and
networks. Systems, machines and components should only be connected to the enterprise
network or the internet if and to the extent necessary and with appropriate security measures
(e.g. use of firewalls and network segmentation) in place.
26
requirements in the guidelines specified in the "Standards and regulations" section of the
"Technical data and drawings." Ensure that the specific safety and construction regulations
and the regulations for using personal protective equipment are observed during all work.
when carrying out any work.
connection, ambient and operating conditions are taken into account at all times.
allowed to carry out basic planning and all work on the converter.
connected properly (cables and busbars).
adequate auxiliary power supply are to be observed.
accordance with the commissioning instructions.
components such as the circuit-breaker, transformer, cables, and motor are adjusted for
converter operation.
are permitted only after special arrangement with the manufacturer.
SINAMICS GM150 6SL3815-2LN41-4AA2
Operating Instructions 04/2017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents