Chrysler Sebring 2004 Service Manual page 2054

Table of Contents

Advertisement

P0403 - EGR SOLENOID CIRCUIT —
TEST
7
Turn the ignition off.
Disconnect the PCM harness connector.
Disconnect the EGR Solenoid harness connector.
Measure the resistance of the (K35) EGR Solenoid Control circuit between the PCM
harness connector and the EGR Solenoid harness connector.
Is the resistance below 5.0 ohms?
Yes → Go To 8
→ Repair the open in the (K35) EGR Solenoid Control circuit.
No
8
NOTE: Before Continuing: Disconnect the PCM harness connector and
check the related wiring terminals for corrosion, damage or terminal push
out. Repair as necessary.
Using the schematics as a guide, inspect the wire harness and connectors. Pay
particular attention to all Power and Ground circuits.
If there are no possible causes remaining, view repair.
Repair
ACTION
Perform POWERTRAIN VERIFICATION TEST VER - 5.
Replace and program the Powertrain Control Module in accor-
dance with the Service Information.
Perform POWERTRAIN VERIFICATION TEST VER - 5.
DRIVEABILITY - GAS
Continued
125
APPLICABILITY
All
All

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2004Stratus 2004

Table of Contents