Delta Electronics AH500 Operation Manual page 395

Hide thumbs Also See for AH500:
Table of Contents

Advertisement

Method 2
Select All Nodes on the node list, right-click All Nodes, and click Online (All Nodes) on the
context menu.
Additional remark
Before the system enters a monitoring mode, it checks whether the Ether Link constructed in the Ether Link
Configuration window is consistent with the setting in the PLCs. If the Ether Link constructed in the Ether Link
Configuration window is not consistent with the setting in the PLCs, the system will ask the users to download
the related parameters again.
B. Monitoring Statuses
After the system enters a monitoring mode, the node which is monitored will be colored on the node list.
Besides, the words and the pictures in the display area will indicate the execution status of the current
Ether Link after the system enters a monitoring mode.
Status
Running/Stopping
Operating status
Start mode
Data block
C h a p t e r 11 C o n v e n i e n t F u n c t i o n s
Description
: The Ether Link constructed is executed.
: The Ether Link is not executed.
: The Ether Link constructed is executed
normally.
: The Ether Link constructed is not
executed normally.
: Always Stop
: Always Run
: SM Flag
: The data exchange is being
performed.
: The performance of the data
exchange stops.
11 - 5 1

Advertisement

Table of Contents
loading

Table of Contents