Other Operations - Siemens SIMATIC S5-95F Manual

Table of Contents

Advertisement

S5-95F
8.3.4

Other Operations

Table 8-29 provides an overview of the remaining system operations.
Operation
Operand
TAK
STS
Processing the "STS" Operation
When the "STS" operation is executed, the programmable controller goes into the STOP mode
immediately. Program processing is terminated at this point.
To return the PLC to RUN mode:
In safety mode you can only do this manually using the RUN/STOP switch
In test mode you can do this either manually using the RUN/STOP switch or on a programmer
using the programmer function "PLC Start".
Note
In safety mode a STOP initiated by the "STS" operation can only be cancelled
manually by operating the two RUN/STOP switches. A STOP initiated by the "STS"
operation is regarded as a safety stop in safety mode.
A STOP initiated by the "STS" operation has the same status in safety mode as a
STOP produced by the RUN/STOP switches.
EWA 4NEB 812 6210-02
Table 8-29. The "TAK" and "STS" Operations
Swap accumulator contents
Swap the contents of ACCU 1 and ACCU 2 regardless of the
RLO. The RLO and the condition codes are not affected.
Stop immediately
The PLC goes into the STOP mode regardless of the RLO.
Meaning
STEP 5 Operations
8-67

Advertisement

Table of Contents
loading

Table of Contents