Operation at Power-on
● Time chart
BUSY flag
● Delay time rules
1. Time required for power-on
This is the time required until power-on. This depends on the power supply to be used.
2. S-LINK V transmission check
Number of I/O control
points
32
64
96
128
160
192
224
256
288
320
352
384
416
448
480
512
3. Accessible zone
Following the transmission check of the S-LINK V system, various accesses from the master become possible.
Power-on
Time required for power-on
ON
OFF
A mode
B mode
1496.0
1696.0
1509.0
1750.0
1528.0
1824.0
1551.0
1917.0
1579.0
2028.0
1611.0
2158.0
1649.0
2307.0
1690.0
2475.0
1737.0
2661.0
1788.0
2867.0
1844.0
3091.0
1905.0
3334.0
1971.0
3596.0
2041.0
3876.0
2116.0
4176.0
2195.0
4494.0
Displays 'rdy' till here.
S-LINK V transmission check
Transmission start
(ms)
C mode
2495.0
2715.0
3009.0
3379.0
3825.0
4345.0
4941.0
5612.0
6358.0
7180.0
8077.0
9049.0
10096.0
11219.0
12417.0
13690.0
Transmission Delay Time
16