General Site Guidelines - Juniper ACX2200 Hardware Manual

Universal access router
Hide thumbs Also See for ACX2200:
Table of Contents

Advertisement

ACX2200 Universal Access Router Hardware Guide
Table 14: Site Preparation Checklist (continued)
Item or Task
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
Cables
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.
Plan the cable routing and management.
Related
Documentation

General Site Guidelines

Related
Documentation
30
For More Information
"Clearance Requirements for Airflow
and Hardware Maintenance on
ACX2200 Routers" on page 33
Installing and Connecting an ACX2200 Router Overview on page 63
General Site Guidelines on page 30
Efficient device operation requires proper site planning and maintenance and proper
layout of the equipment, rack or cabinet (if used), and wiring closet.
To plan and create an acceptable operating environment for your device and prevent
environmentally caused equipment failures:
Keep the area around the chassis free from dust and conductive material, such as
metal flakes.
Follow prescribed airflow guidelines to ensure that the cooling system functions properly
and that exhaust from other equipment does not blow into the intake vents of the
device.
Follow the prescribed electrostatic discharge (ESD) prevention procedures to prevent
damaging the equipment. Static discharge can cause components to fail completely
or intermittently over time.
Install the device in a secure area, so that only authorized personnel can access the
device.
Prevention of Electrostatic Discharge Damage on page 151
Performed By
Date