Mitsubishi Q01CPU User Manual page 579

Melsec-q series, qcpu
Hide thumbs Also See for Q01CPU:
Table of Contents

Advertisement

12
TROUBLESHOOTING
Basic
Note12.16
High
Performance
Process
Note12.17
Note14
Basic
Failure of redundant power supply cannot be detected by the Basic model QCPU.
Note12.16
Note15
High
Performance
Process
When using the High Performance QCPU or the Process CPU, confirm the versions of CPU
module and GX Developer. (
Note12.17
POINT
1. If either redundant power supply module fails, change it for a normal one
earlier than usual (within 14 days as a guideline).
If it does not fail, it is recommended to change the redundant power supply
module for a new one after five years have elapsed.
2. Change the redundant power supply module with extreme care, referring to
Section 10.3.3(1).
If the module fixing projection of the redundant power supply module comes
off from the module fixing hole of the redundant base unit, an error will occur
due to connector damage.
3. When the redundant power supply system is used, a "continue" error will
occur due to a redundant power supply module failure. Cancel the error after
changing the faulty redundant power supply module for a normal one.
Note12.16 Note12.17
4. When the redundant power supply system is used, the failure status of the
redundant power supply module can be checked by the system monitor of GX
Developer (Version 8.18U or later) or the special relay SM1781/special
register SD1781.
Refer to the following manual for details of the system monitor.
GX Developer Operating Manual
12.4.2 Change of redundant power supply module
Note12.16 Note12.17
Note14Note15
Appendix 2)
12.4 Module Change during System Operation
9
10
11
12
12
- 255

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents