BMW AG Motorcycle Division
Pre-delivery check
K 1200 LT
Customer
Order No.
Check the shipping crate for damage
Unpacking the motorcycle
–
unpack
–
inspect for damage
–
check that delivery is complete
Installing remaining items on motorcycle
–
Fit front wheel and mudguard
–
Fit the mirror
–
Fit the right-hand side footrest and passenger footrest plate
–
Fit engine spoiler, reversing aid actuation, bumpers
–
Install the top case
Fill and charge the battery (mark with charging date)
Check the front/rear brake fluid level
Check clutch fluid level
Check tyre pressures
Check rear wheel studs for tightness (note correct tightening torque)
Fit antenna, windshield
Checking and adjusting the motorcycle
–
Check function of side stand contact switch
–
Seat
–
Top case
–
Headlight, spring strut
Add fuel
Final inspection and function check
–
Check engine oil when engine is cold
–
Clutch, gearshift mechanism, reversing aid
–
Lighting and signalling equipment, telltale lights, instruments
–
Check radio for operation
–
Hand brake and foot brake, ABS
–
Check optional equipment for operation
CD player, on-board computer, cruise control
–
Trial run if necessary
Confirm pre-delivery check in Service and Technical Booklet
Final cleaning
Motorcycle handed over on:
Order No. 01 71 9 799 278
Licence plate No.
Mechanic's signature
Motorcycle keys
Top case lock cylinder
Toolkit and helmet lock
Documentation
Top case (packed separately)
Optional extras
UX-VS-2, 01/99
BMW
Pre-delivery check
Printed in Germany