Preparing The Mounting Brackets And Slide Rail Assemblies - Compaq ProLiant 5500 Setup And Installation Manual

Pentium ii xeon and pentium iii xeon processor-based servers
Hide thumbs Also See for ProLiant 5500:
Table of Contents

Advertisement

3-8
Rack-Mount Server Installation
Slotted screwdriver
Application software diskettes, such as SmartStart and Support Software
CD
Options to be installed, such as
Preparing the Mounting Brackets
and Slide Rail Assemblies
Each pair of mounting brackets, with attached slide rail assemblies supports one
rack-mountable server.
Figure 3-2.
Each slide rail assembly consists of an outer bracket rail and an inner server rail
(see the following figure). These pieces can be separated; the bracket rails
attach to the rack mounting brackets (shown in the previous figure), and the
server rails attach to the sides of the server chassis.
Optional monitor, keyboard, etc.
Integrated Management Display (tower model only)
Array Controller
Redundant fans
Rack mounting brackets; alignment tabs identify the front flanges
For use with Pentium II Xeon and Pentium III Xeon processor-based servers only

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant 5500r

Table of Contents