1.
Pull the slide rails forward from the mounting brackets.
2.
Carefully align the server rails with the slide rails of rack and slide the
server into the rack.
CAUTION:
sliding the server rails into the slide rails. Tilting the server up or
down could result in damage to the rails.
Figure 3-14. Loading the rack server
For use with Pentium II Xeon and Pentium III Xeon processor-based servers only
Be sure to keep the server parallel to the floor when
Compaq ProLiant 5500 and 5500R Servers Setup and Installation Guide