Compaq ProLiant 5500 Setup And Installation Manual page 167

Pentium ii xeon and pentium iii xeon processor-based servers
Hide thumbs Also See for ProLiant 5500:
Table of Contents

Advertisement

Processor Power Module
installing next to processor 4-5
ProLiant 5500 weight 3-22
R
Rack
attaching server rail to server
3-20
cable management arm bracket
3-21
Configuration Tool 3-7
inserting cage nuts 3-16
installing mounting bracket 3-18
installing rack model server 3-1
loading server 3-22
locating materials 3-5
Rack Products CD 3-7
safety warnings 3-1
server cable management arm
3-25
server safety 3-22
slide rail assembly 3-9
stability warning 3-14
template 3-14
tools needed for installation 3-7
unpacking the rack server 3-4
Rack Builder Configuration Tool 3-7
Rack Information Library CD
using to print rack information
3-7
Rapid Recovery 1-5
regulatory compliance
identification number A-1
regulatory compliance label location
A-8
Release latch
using with server rails 3-24
For use with Pentium II Xeon and Pentium III Xeon processor-based servers only
removal
IMD blank illustrated 6-2
ROM 1-4
ROM Date field 6-9
S
Safety, rack server 3-22
SCSI
cabling examples 7-13
cabling needs 7-6, 8-6
connectors
connectors, internal 7-18
controller connection
controller outputs 7-7
controllers, integrated 7-7, 8-6
drive cage
drive configurations 1-12
drive, standard configuration for
drive, using optional controller
fast 7-6
fast wide 7-6
input connectors 7-8, 7-18, 8-8
port 1 7-7
port 2 7-7
simplex mode 7-8
storage capacity 1-12
support 1-3, 7-7, 8-6
wide ultra 7-6
SCSI Cable Connectors 8-3
Compaq ProLiant 5500 and 5500R Servers Setup and Installation Guide
internal 7-8, 8-8
standard for simplex drive
cage, illustrated 7-15
illustrated 7-7
input 0 7-9
simplex drive cage 7-13
7-15
Index-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant 5500r

Table of Contents