Attaching Server Rails - Compaq ProLiant 5500 Setup And Installation Manual

Pentium ii xeon and pentium iii xeon processor-based servers
Hide thumbs Also See for ProLiant 5500:
Table of Contents

Advertisement

3-20
Rack-Mount Server Installation

Attaching Server Rails

1.
Place the tab on a server rail at the front of the server chassis. The holes
in the server rail will line up only one way with the chassis.
2.
Attach the flat side of a server rail to each side of the server chassis with
four 8-32 x 1/4-inch Phillips screws. Do not use washers with the
screws.
Figure 3-12.
Attaching a server rail to the server
For use with Pentium II Xeon and Pentium III Xeon processor-based servers only

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant 5500r

Table of Contents