Applying Power And Verifying The Installation - Cisco ASR 5000 Installation Manual

Hide thumbs Also See for ASR 5000:
Table of Contents

Advertisement

Applying Power and Verifying the Installation

This chapter provides information and instructions for understanding the boot process, applying power to
the chassis, and verifying that the installation was successful.
Important
This chapter includes the following sections:
Understanding the System Boot Process
Before you apply power to the system, it is important that you understand the boot process and how the
hardware components are brought on line.
This chapter assumes that the ASR 5000 chassis, its sub-components, as well as application and line cards
have been physically installed. The system has also been cabled to interoperate with management and
traffic networks.
Understanding the System Boot Process, page 133
Applying Power to the Chassis, page 136
Verifying the Installation, page 137
Completing Initial System Configuration, page 167
12
C H A P T E R
ASR 5000 Installation Guide
133

Advertisement

Table of Contents
loading

Table of Contents