r Pre-Assembly Step 4
Past the fuse holder red lead (+),PT&T solenoid ground cable and starter solenoid green lead
through the hole in the center of the solenoid bracket; then install the starter solenoid, power trim
and tilt solenoid and fuse holder.
Rectifier regulator
t
Completed Pre-Assembly
Rectifier Regulator
Partially tighten the connector on the fuse holder red lead.
Fuse holder
red lead (+)
Starter solenoid green lead
5-18
Starter solenoid
PT&T solenoid
PT&T solenoid ground cable