Christie Roadster S+12K Setup Manual page 49

Hide thumbs Also See for Roadster S+12K:
Table of Contents

Advertisement

Roadster, Matrix WU, Mirage S+/HD/WU Setup Guide
020-100342-02 Rev. 1 (04-2011)
6. INSERT THE NEW LAMP MODULE
Align the base plate of the new lamp
module under both side alignment guides
(see right). Slide the module fully into the
projector in the same orientation you
removed the old lamp module. Push with
normal force until the resistance increases,
then firmly push module another ½ inch.
NOTE: The lamp module must make full contact with the lamp connectors.
Increased resistance when sliding the module in indicates initial contact with
these connectors—push firmly at this point.
Improper installation could cause a serious
7. RE-INSTALL LAMP RETAINING BAR
Position the retaining bar along the bottom edge of the lamp module, with its
ends under the alignment guides. If the bar does not fit, push the lamp module
further in. See Figure 4.5.
The tightening order of the screws is
critical for proper lamp contact and alignment.
Secure screw B until just engaged.
Secure screw A until just engaged.
Go back and forth between A and B to lock the bar in place with even
pressure and correctly position the lamp module.
Figure 4.5. Install Retaining Bar
WARNING
meltdown inside the projector.
IMPORTANT
Maintenance
4-7

Advertisement

Table of Contents
loading

Table of Contents