10. Reconnect to the system board the cables that you disconnected in step 11 of
11. Install the cover (see "Installing the cover" on page 130).
12. Slide the server into the rack.
13. Reconnect the power cords and any cables that you removed.
14. Turn on the peripheral devices and the server.
Important: Perform the following updates:
v Either update the server with the latest RAID firmware or restore the pre-existing
v Update the UUID (see "Updating the Universal Unique Identifier (UUID)" on page
v Update the DMI/SMBIOS (see "Updating the DMI/SMBIOS data" on page 214).
192
IBM System x3250 M3 Types 4251, 4252, and 4261: Problem Determination and Service Guide
System board
(8 screws)
3. Reinstall the microprocessor and heat sink (see "Installing the microprocessor"
on page 186).
4. Reinstall the DIMMs (see "Installing a memory module" on page 152).
5. Reinstall the DIMM air baffle (see "Installing the DIMM air baffle" on page 133).
6. Reinstall ServeRAID-BR10il v2 SAS/SATA adapter (see "Installing an IBM
ServeRAID-BR10il SAS/SATA Controller v2" on page 183).
7. Reinstall the riser-card assembly (see "Installing the riser-card assembly" on
page 134).
8. Reinstall the virtual media key (see "Installing the virtual media key" on page
167).
9. Reinstall the hypervisor flash device (see "Installing a USB embedded
hypervisor flash device" on page 165).
"Removing the system board" on page 190.
firmware from a diskette or CD image.
211).