Diagnose
When measurement is complete, press
Sign convention (for vertical machines)
POSITIVE GAP opens towards 0:00 or 3:00
POSITIVE OFFSET if the top coupling half is offset towards 0:00 or 3:00
Cycle through the coupling results and the flange corrections by pressing
repeatedly.
The shim corrections are numbered to correspond with the bolt positions. The
bolt position corresponding to the currently highlighted calculated shim correction
value appears numbered and highlighted with an orange dot.
Use the navigation keys to cycle through the shim values.
to view the diagnosis.
DIAGNOSE
Note
Vertical flanged machines
DIAGNOSE
Diagnose
117