Fluke 830 User Manual page 124

Fluke 830 laser alignment tool users manual
Hide thumbs Also See for 830:
Table of Contents

Advertisement

830
Users Manual
to take the first measurement point.
4. Press
ENTER
After taking measurement point, the clock hour hand moves automatically to
the next clock position. (If the first measured position is 12:00 o'clock, then the
hour hand moves to the 1.30 o'clock position).
5. Rotate the shafts to the next measurement position (this could be either 1:30,
3.00, 4.30, 6.00, 7.30, 9.00 or 10.30 o'clock position).
If shaft rotation restrictions hinder the taking of measurement at particular
shaft positions, bypass these using the navigation keys.
6. Press
to take measurement point.
ENTER
A minimum of three measurement positions are required to obtain results, but
it is recommended that a maximum number of measurement points over a
wider rotational angle be taken to enhance the diagnosis.
116
Note
Note
Note

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents