Chrysler Conquest 1988 Service Manual page 344

Electrical
Hide thumbs Also See for Conquest 1988:
Table of Contents

Advertisement

8-334
._I_
-.
_-__.
ETACS
- Checking
Circuit
29.
Passing
Relay
Power-supply
Circuit
To battery
Fuse
A-a
*i
(Front harness side)
(Front harness side)
16'13593
16'13593
NOTES
NOTES
The check-table
shown
below
is based upon the assumptiorxthat
The check-table
shown
below
is based upon the assumptiorxthat
the passing
relay drive circuit is normal.
the passing
relay drive circuit is normal.
[Refer to check chart No. 28. In addition,
the headlights
(high beam)
[Refer to check chart No. 28. In addition,
the headlights
(high beam) should go on when
the passing~switch
is
should go on when
the passing~switch
is
turned
on -with
ignition
switch
ACC or ON.]
turned
on -with
ignition
switch
ACC or ON.]
Headlight
Passing
relay
1
Passing
control
relay
Disconnect
the ECU
harness
connector
and short
the terminal
@ (front
harness
side,
BG line)
to drive.
the passing
relay.
B-a connec-
tor:
separation
CU: EIectronic~Control
Unit
Harness
dam-
Repair
the
harness.
age&or
discon-
netted

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents