Chrysler Conquest 1988 Service Manual page 167

Electrical
Hide thumbs Also See for Conquest 1988:
Table of Contents

Advertisement

IGNITION
SYSTEM
-
Distributor
8-155
Coil resistance
measuring
terminals
6EL02
6EL03E
6EL03E
6EL040
INSPECTION
PICK-UP
COIL
(1) Using
an ohmmeter,
measure
resistance
of pickup
coil.
Resistance
value:
920 - 1,120
fZ
Caution
Do
not
insert
tester
probe
into
igniter
connecting
terminals,
as damage
to terminals
could
result.
(2) When coil resistance
is to be measured
without
disassemb-
ling distributor
assembly,
insert
tester
probes
through
portions
shown
in illustration.
SERVICE POINTS OF REASSEMBLY
23. INSTALLATION
OF DRIVEN
GEAR
/ 22. SPRING
PIN
(1) Install
driven
gear into distributor
shaft
at previously
marked
location.
Then
install new
roll pin.
(2) Align punch mark on gear with mating
mark on housing,
check
to ensure
that
notched
portion
of shaft
end is
positioned
as shown,
and then install a pin to secure the
gear to the shaft.
19. INSTALLATION
OF STATOR
Before the stator is installed,
check to ensure that there are
no iron filings
or iron pieces
on the stator.
12. INSTALLATION
OF GOVERNOR
BASE
AND
SIGNAL
ROTOR
ASSEMBLY
After
the governor
assembly
has been installed,
turn the
shaft to confirm
that the projection
of the signal rotor does
not touch
the stator.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents