Cable Routing - Yamaha FZS1000N Service Manual

Hide thumbs Also See for FZS1000N:
Table of Contents

Advertisement

EAS00035

CABLE ROUTING

A Fasten the handlebar switch lead (right) and han-
dlebar with a plastic band.
B Route the handlebar switch lead (right) backward
the throttle cable and right side the brake hose
guide.
C Fasten the handlebar switch lead (left) and handle-
bar with a plastic band.
D Fasten the handlebar switch lead (left), main switch
lead, clutch cable and starter cable with a plastic
band. Clamp beneath the horn lead branching posi-
tion. Do not fasten the horn lead.
E Route the main switch lead front and left side the
another leads.
CABLE ROUTING
F Route the horn lead outside the motorcycle body,
and fasten with the under bracket. Do not loose be-
tween the horn and under bracket.
G Route the brake hose through the brake hose
guide.
H Route the throttle cable 1 and 2 backward the brake
hose, and left side the brake hose guide.
2-35
SPEC

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fzs1000nc

Table of Contents