Chint Power CPS SCA20KTL-DO Installation And Operation Manual page 59

Cps sca series grid-tied pv inverter
Table of Contents

Advertisement

→ 1 VDE-0126
2 VDE-4105
3 G59/2
4 C10/11
5.) When the LCD screen shows the normal operation status (Figure 4-3) and
the "RUN" light on the LED panel lights up, it indicates that the grid connection
and power generation are successful.
PV1
625 V
18.5A
08/12 13:10:05
6.) If the inverter fails to operate normally, "FAULT" light will light up and the
fault information will show on the LCD screen.
(Please refer to 7.1.2 Troubleshoot LCD faults)
7.) Set up system time and language
Set up the system time and language according to "5.4.4 System
configuration".
8.) To check the real time operation information, you can refer to "5.4.1
Operation information".
Figure 4-2 Select grid standard
231
23.1
223.2
(a)
Figure 4-3 Normal operation status
5 CEI 0-21
6 IEEE1547
7 BDEW
PV2
622 V
19.3A
08/12 13:10:10
(b)
55
231
23.1
223.2