Chint Power CPS SCA20KTL-DO Installation And Operation Manual page 55

Cps sca series grid-tied pv inverter
Table of Contents

Advertisement

b.) Put the Ethernet cable through the cable gland and inside the wiring box. Make
the cable terminals as shown in Figure 3-43.
Tools: Wire stripping pliers, crimping pliers
c.) Plug the cable terminal into the corresponding connector.
d.) Tighten the nut of the cable gland.
④ Zigbee communication cable connection:
a.) Take out the waterproof connector from the accessory kit. Loosen the nut at
the end of the cable gland, take off the waterproof rubber plug, and cut off one
of the hole of the rubber plug.
Tool: Utility knife
b.) Put the antenna cable through the rubber plug, and assemble the
waterproof cable gland in sequence. Tighten the nut at the end of the cable
gland.
c.) Screw off the plastic plug beside the communication cable gland.
Tool: 4mm flat screwdriver
d.) Screw on the waterproof cable gland in the unplugged hole, and fix the
ZigBee antenna at the bottom of the inverter.
Tool: No.2 Phillips head screwdriver
e.) Tighten the cable of the ZigBee antenna on the connector of
communication card.
51

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CPS SCA20KTL-DO and is the answer not in the manual?

Questions and answers

Table of Contents