Test Run - Hyundai n 700 Instruction Manual

Hide thumbs Also See for n 700:
Table of Contents

Advertisement

N700 Operating Instructions and Parts Manual
3.2

Test Run

This is an example of a common connection. Please refer to 4.1 Digital Operator, for the detailed
use of the digital operator (OPE-N7).
3.2.1
To input the operation setting and the frequency setting from the terminal control.
(Procedure)
(1) Please make sure that the connections are secured correctly.
(2) Turn the MCCB on to supply power to the inverter.
(The LED "POWER" on the operator should illuminate)
(3) Set the terminal with the frequency setting selection.
Set F010 as the indication code, press the
Set 1(Terminal) with
the operator.(Indication code turns back to F010.)
(4) Set terminal with the operation setting selection.
Set F011 as indication code, press the
Set 1(terminal) with the
for the operator.(Indication code turns back to F011.)
(5) Set Monitor mode
When monitoring the output frequency, set indication code to d001, and press the
Or when monitoring the operation direction, set indication code to d002, and press the
key.
(6) Input starting operation setting.
Turn ON between [FW] and [CM1] of terminal.
Apply voltage [O] and [L] of terminal to start operation.
(7) Input ending operation setting.
Turn OFF between [FW] and [CM1] to slowly stop.
Digital input
Analog input
Fig. 3- 1 Setting diagram from the terminal control
key, press the
key, press the
Digital Output
Relay Output
key once. (Code values are shown)
key once to set the frequency setting for
key once.
key once to set the frequency setting
22
3. Operation
key.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hi run n 700

Table of Contents