type hoses are used, loosen the hose connec
tions at gage manifold to release the vapor
pressure from the compressor.
• Disconnect both gage adapters or hoses from
J 9625-A.
• Add 0.085 kg (3 oz.) new 525 viscosity refriger
ant oil to the com pressor assembly. Rotate the
complete com pressor assem bly (not the shaft
or drive plate hub) slowly several turns to dis
tribute oil to all cylinder and piston areas.
• Install the shaft nut (1) on the com pressor
shaft (20) if the pulley assem bly and clutch
plate and hub assem bly are not installed.
• Using a box-end wrench, or a socket and han
dle, rotate the com pressor shaft (20) or clutch
plate on the shaft (20) several turns to lubri
cate the pistons and cylinder walls.
• Connect the charging station high-pressure
line, or a h ig h -p re s s u re g a g e and g age
adapter to J 9625-A high-side connector.
• Attach an adapter or depressor-type hose to
the suction or low-pressure port of J 9625-A to
open the Schrader-type valve. Oil will drain out
of the com pressor suction port adapter if the
com pressor is positioned with the suction port
downward.
• Attach the com pressor to J 33026 fixture and
mount the com pressor in a vise so that the
com pressor will be in a horizontal position and
the shaft (20) can be turned with a wrench.
Type — Harrison H R -6 ......................................................................................................................................................6 C ylinder Axial
D is p la c e m e n t.............................................................................................................................................................................. 10.0 Cu. In.
R o ta tio n............................................................................................................................................................................................ Clockwise
Clutch Plate Air G a p .............................................................................................................................0.38-0.64 mm (0.015-0.025 inch)
Oil C a p a c ity ........................................................................................................................................................................0.227 Kg. (8 oz.)
Ohms (at 2 7 ° C - 8 0 ° F ) ................................................................................................................................................................... 3.56-3.89
Amps (at 2 7 ° C -8 0 ° F ).......................................................................................................................................................... 3.2 @ 12 Volts
Compressor Suction and Discharge C onnector Bolt
Through B o lts ....................................................................
Shaft N u t.............................................................................
Pressure Relief V alve...................................................................................................................................................
HR-6 AIR CONDITIONING COMPRESSOR 1B5-15
SPECIFICATIONS
HR-6 COMPRESSOR
CLUTCH COIL
TORQUE SPECIFICATIONS
• Rotate the com pressor shaft (20) or drive plate
hub six to eight com plete revolutions at a
speed of approxim ately one revolution per
second. A slower rotation can result in a lower
p u m p -u p p re ssu re and d is q u a lify a good
pum ping compressor.
• O bserve the reading on the high-pressure
gage at the com pletion of the tenth revolution
of the com pressor shaft (20). The pressure
re a d in g fo r a good p u m p in g c o m p re sso r
should be 690 kPa (100 psi) or above. A pres
sure reading of less than 620 kPa (90 psi)
would indicate one or more suction and/or dis
charge valves leaking, an internal leak, or an
inoperative valve. Disassemble the com pres
sor and repair as necessary. Reassemble and
repeat the pum p-up test.
• Following the pressure pump-up test, release
the air pressure from the high side and remove
the gage adapters and J 9625-A test plate.
• Tilt the com pressor to place the suction and
discharge ports downward to allow the oil to
drain from the compressor.
• A llo w a 10-m inute d ra in p e rio d and then
c h a rg e th e c o m p re s s o r w ith th e p ro p e r
am ount of oil. Pour the new 525 viscosity re
frigerant oil into the suction port.
• If further assem bly or processing is required,
install a shipping plate or test plate J 9625-A to
protect the com pressor from contam ination.
.24 N m (18 Ft. Lbs.)
. .9 N m (84 In. Lbs.)
.16 N m (12 Ft. Lbs.)
9
N m (84 In. Lbs.)