Engine Set-Up And T E S Tin - Chevrolet 1988 Light Duty Truck Repair Manual

Chevrolet 1988 light duty truck unit repair manual
Table of Contents

Advertisement

ENGINE SET-UP AND TESTING
1. After overhaul, the engine should be tested before
installation in the vehicle. If a suitable test stand is
not available, the following procedure can be used
after the engine is installed in the vehicle.
2. Fill the crankcase with the proper quantity and
grade of oil.
Im po rtant
• If a new cam shaft or hydraulic lifters were
a
INITIAL TIGHTENING SEQUENCE
( ® ©
(§) ®
icpj|) (gig)
FINAL TIGHTENING SEQUENCE
A
Front O f Engine
Figure 41— Intake Manifold Bolt Tightening Sequence
C. Port B lo ckin g Plate
D. RTV Sealant
Figure 40— Intake Manifold Installation
< §><
J
d
B-07873
4.3 LITER V-6 6A3-25
F-05521

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1979 light duty truck

Table of Contents