Toshiba RAV-SM563UT-E Service Manual page 153

Air-conditioner split type
Hide thumbs Also See for RAV-SM563UT-E:
Table of Contents

Advertisement

No.
Part name
Cycle P .C. board
Procedure
1) Perform the works in 1 of
2) Remove connectors and lead wires
which are connected from the cycle P .C.
board to other parts.
1. Connector
CN800: Connection with IPDU P .C.
board (5P: Red) *(Note 1)
CN01: Connection with IPDU P .C.
board (5P: Red) *(Note 1)
CN02: Indoor/Outdoor connection
terminal block (5P: Black)
*(Note 1)
CN03: Connection with IPDU P .C.
board (3P: White) *(Note 1)
CN04: Connection with IPDU P .C.
board (2P: White) *(Note 1)
*(Note 1)
Remove the connectors by releasing lock of
the housing.
3) Remove the supporting hooks at 4
corners to remove the cycle P .C. board.
4) Mount a new cycle P .C. board.
5) Lift up the hook (upper left) with the
partition plate upward just removing.

ƒ
and
.
– 153 –
Remarks
Cycle control P.C. board assembly
P.C. board fixing hooks
(4 positions)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents