7.
If you have other VTrak RAID Subsystems, repeat the same procedure for
each of them.
As each controller shuts down, your WebPAM PROe connection is lost.
8.
Wait for two to three minutes.
9.
Turn off the power switches for all subsystems.
10. Wait 30 seconds, then turn on the power switches on all JBOD
subsystems.
11. Wait 30 more seconds, then turn on the power switches on the RAID
subsystem.
12. Wait 2 to 3 minutes for the Head Unit to boot, then log into WebPAM PROe.
If you cannot log in, wait for 30 seconds and try again.
253
Chapter 6: Maintenance